ITAC Assessment: WI0213
ITAC logo
ITAC Assessment: WI0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Metal,Polyester, & Plastic zippers, fabricated buckled/unbuc
NAICS
n/a
SIC 3965: Fasteners, Buttons, Needles, and Pins
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 59,400
ft2
Annual Production 24,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,371 738,863
kWh
Natural Gas $14,433 3,484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,665

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3135: Schedule routine maintenance during non-operating periods $4,449 - - $4,449
-
MMBtu
02 2.7224: Reduce space conditioning during non-working hours $4,383 $2,000 - $4,383
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,758 $4,000 $2,758
35,463
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $669 $1,713 $669
8,499
kWh
-
05 2.7135: Install occupancy sensors $663 $600 $663
8,499
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,597 $1,000 $1,597
23,740
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $501 $640 $501
6,448
kWh
-
TOTAL RECOMMENDED $15,020 $9,953 $6,188
82,649
kWh
$8,832
-
MMBtu
TOTAL IMPLEMENTED $10,665 $4,953 $1,833
23,446
kWh
$8,832
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs