| Assessment Year | 1994 |
|---|---|
| Principal Product | Corrugated cartons and point-of purchase displays |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
245,000
ft2
|
| Annual Production | 780,000,000
thousand feet
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $451,622 | 6,324,150 |
kWh
|
$0.071 |
| Natural Gas | $244,205 | 72,809 |
MMBtu
|
$3.35 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $54,206 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,860 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3132: Recharge batteries on during off-peak demand periods | $15,775 | $23,025 |
$15,775
-
kWh
|
- | |
| 02 | 2.3135: Schedule routine maintenance during non-operating periods | $7,285 | - |
$7,285
-
kWh
|
- | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $13,192 | $32,000 | - |
$13,192
-
MMBtu
|
|
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,085 | $500 | - |
$5,085
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,164 | $6,191 |
$6,164
86,460
kWh
|
- | |
| 06 | 2.7135: Install occupancy sensors | $2,219 | $1,125 |
$2,219
31,067
kWh
|
- | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $2,673 | $960 |
$2,673
37,515
kWh
|
- | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,264 | $1,167 |
$1,264
17,585
kWh
|
- | |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $549 | - |
$549
4,982
kWh
|
- | |
| TOTAL RECOMMENDED | $54,206 | $64,968 |
$35,929
177,609
kWh
|
$18,277
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $20,860 | $23,525 |
$15,775
-
kWh
|
$5,085
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs