Assessment Year | 2002 |
---|---|
Principal Product | Petroleum refining and asphalt |
NAICS |
n/a
|
SIC | 2911: Petroleum Refining |
Sales Range | $10 M to 50M |
# of Employees | 15 |
Plant Area |
365,904
ft2
|
Annual Production | 170,000
ton
|
Production Hrs. Annual | 7,288
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $140,570 | 1,754,720 |
kWh
|
$0.080 |
Electricity Demand | $10,367 | 6,365 |
kW-mo/yr
|
$1.63 |
Electricity Fees | $11,514 | - |
|
- |
Natural Gas | $1,096,503 | 140,981 |
MMBtu
|
$7.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $325,363 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $308,346 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $11,660 | $14,391 |
$10,447
143,646
kWh
|
$1,213
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,578 | $3,816 |
$2,085
28,670
kWh
|
$493
-
kW-mo/yr
|
- | - | - | |
03 | 2.7135: Install occupancy sensors | $194 | $600 |
$151
2,083
kWh
|
$43
-
kW-mo/yr
|
- | - | - | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $1,995 | $4,200 |
$1,458
20,045
kWh
|
$537
-
kW-mo/yr
|
- | - | - | |
05 | 3.3128: Utilize other methods to remove contaminants | $14,828 | $11,575 | n/a | - | - |
$5,000
-
gal
|
$9,828 | - |
06 | 4.521: Clear and rent existing space | $294,108 | $3,024 | - | - | - | - | $294,108 | |
TOTAL RECOMMENDED | $325,363 | $37,606 |
$14,141
194,444
kWh
|
$2,286
-
kW-mo/yr
|
$5,000
-
gal
|
$9,828 | $294,108 | ||
TOTAL IMPLEMENTED | $308,346 | $21,231 |
$12,532
172,316
kWh
|
$1,706
-
kW-mo/yr
|
- | - | $294,108 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs