ITAC Assessment: AS0316
ITAC logo
ITAC Assessment: AS0316
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Petroleum refining and asphalt
NAICS
n/a
SIC 2911: Petroleum Refining
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 365,904
ft2
Annual Production 170,000
ton
Production Hrs. Annual 7,288
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,570 1,754,720
kWh
Electricity Demand $10,367 6,365
kW-mo/yr
Electricity Fees $11,514 -
Natural Gas $1,096,503 140,981
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $325,363 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $308,346

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $11,660 $14,391 $10,447
143,646
kWh
$1,213
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,578 $3,816 $2,085
28,670
kWh
$493
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $194 $600 $151
2,083
kWh
$43
-
kW-mo/yr
- - -
04 2.7232: Replace existing hvac unit with high efficiency model $1,995 $4,200 $1,458
20,045
kWh
$537
-
kW-mo/yr
- - -
05 3.3128: Utilize other methods to remove contaminants $14,828 $11,575 n/a - - $5,000
-
gal
$9,828 -
06 4.521: Clear and rent existing space $294,108 $3,024 - - - - $294,108
TOTAL RECOMMENDED $325,363 $37,606 $14,141
194,444
kWh
$2,286
-
kW-mo/yr
$5,000
-
gal
$9,828 $294,108
TOTAL IMPLEMENTED $308,346 $21,231 $12,532
172,316
kWh
$1,706
-
kW-mo/yr
- - $294,108
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs