ITAC Assessment: WI0206
ITAC logo
ITAC Assessment: WI0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Modern type blueprinting, commercial xeroxing, engineering p
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 33,000
ft2
Annual Production 15,628,800
thousand feet
Production Hrs. Annual 2,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,847 1,218,347
kWh
Natural Gas $23,847 4,157
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,412 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,164

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $5,400 $200 $5,400
275,791
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $596 $700 $596
30,481
kWh
-
03 2.7241: Install outside air damper / economizer on hvac unit $973 $2,100 $973
9,965
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $812 $1,800 $812
8,206
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $771 $1,542 $771
7,913
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $219 $324 $219
2,345
kWh
-
07 2.7135: Install occupancy sensors $178 $225 $178
1,172
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $208 - $208
2,052
kWh
-
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $255 - - $255
-
MMBtu
TOTAL RECOMMENDED $9,412 $6,891 $9,157
337,925
kWh
$255
-
MMBtu
TOTAL IMPLEMENTED $7,164 $2,991 $7,164
317,702
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs