ITAC Assessment: ME0273
ITAC logo
ITAC Assessment: ME0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Horse Feed
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $1
M
to 5
M
# of Employees 21
Plant Area 32,000
ft2
Annual Production 4,000
pieces
Production Hrs. Annual 1,800
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,140 257,034
kWh
Electricity Fees $586 -
Fuel Oil #2 $16,810 3,263
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,599 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,815 $5,192 n/a $3,815
31,653
kWh
- - - - -
02 2.4133: Use most efficient type of electric motors $1,750 $4,260 n/a $1,750
24,912
kWh
- - - - -
03 2.9113: Use solar heat for heat $1,220 $5,472 n/a $1,220
11,430
kWh
- - - - -
04 4.821: Pay bills on time to avoid late fees $421 - n/a - - - - $421 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $309 $100 n/a $309
2,931
kWh
- - - - -
06 4.131: Modify process to reduce material use/cost $23,318 $212,393 n/a - $10,000
-
MMBtu
$1,834
-
lb
$11,484 - -
07 3.1192: Reduce scrap production $13,050 $22,253 n/a - - - - - $13,050
08 3.1161: Eliminate/reduce an operation $1,716 $612 n/a - - - $1,716 - -
TOTAL RECOMMENDED $45,599 $250,282 $7,094
70,926
kWh
$10,000
-
MMBtu
$1,834
-
lb
$13,200 $421 $13,050
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs