| Assessment Year | 1999 |
|---|---|
| Principal Product | Horse Feed |
| NAICS |
n/a
|
| SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
| Sales Range | $1 M to 5M |
| # of Employees | 21 |
| Plant Area |
32,000
ft2
|
| Annual Production | 4,000
pieces
|
| Production Hrs. Annual | 1,800
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $27,140 | 257,034 |
kWh
|
$0.11 |
| Electricity Fees | $586 | - |
|
- |
| Fuel Oil #2 | $16,810 | 3,263 |
MMBtu
|
$5.15 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $45,599 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,815 | $5,192 | n/a |
$3,815
31,653
kWh
|
- | - | - | - | - |
| 02 | 2.4133: Use most efficient type of electric motors | $1,750 | $4,260 | n/a |
$1,750
24,912
kWh
|
- | - | - | - | - |
| 03 | 2.9113: Use solar heat for heat | $1,220 | $5,472 | n/a |
$1,220
11,430
kWh
|
- | - | - | - | - |
| 04 | 4.821: Pay bills on time to avoid late fees | $421 | - | n/a | - | - | - | - | $421 | - |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $309 | $100 | n/a |
$309
2,931
kWh
|
- | - | - | - | - |
| 06 | 4.131: Modify process to reduce material use/cost | $23,318 | $212,393 | n/a | - |
$10,000
-
MMBtu
|
$1,834
-
lb
|
$11,484 | - | - |
| 07 | 3.1192: Reduce scrap production | $13,050 | $22,253 | n/a | - | - | - | - | - | $13,050 |
| 08 | 3.1161: Eliminate/reduce an operation | $1,716 | $612 | n/a | - | - | - | $1,716 | - | - |
| TOTAL RECOMMENDED | $45,599 | $250,282 |
$7,094
70,926
kWh
|
$10,000
-
MMBtu
|
$1,834
-
lb
|
$13,200 | $421 | $13,050 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs