ITAC Assessment: WI0205
ITAC logo
ITAC Assessment: WI0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product point-of-purchase displays, cabinets
NAICS
n/a
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 130,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 3,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,523 1,094,666
kWh
Natural Gas $72,301 22,352
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,599 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,928

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $5,212 $11,695 - $5,212
-
MMBtu
-
02 2.2612: Use cooling tower water instead of refrigeration $3,751 $15,000 $3,751
-
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,651 - $1,651
16,999
kWh
- -
04 2.2437: Recover waste heat from equipment $578 $1,000 - $578
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,764 $4,492 $2,764
28,429
kWh
- -
06 2.7111: Reduce illumination to minimum necessary levels $2,578 - $2,578
26,377
kWh
- -
07 2.7135: Install occupancy sensors $961 $450 $961
9,965
kWh
- -
08 2.3135: Schedule routine maintenance during non-operating periods $2,321 - $2,321
-
kWh
- -
09 2.6241: Reduce temperature of process equipment when on standby $2,074 $500 $907
9,379
kWh
$1,167
-
MMBtu
-
10 2.3132: Recharge batteries on during off-peak demand periods $1,362 $800 $1,362
-
kWh
- -
11 2.1233: Analyze flue gas for proper air/fuel ratio $977 $500 - $977
-
MMBtu
-
12 3.6193: Install equipment (eg compactor) to reduce disposal costs $16,370 $10,000 - - $16,370
-
lb
TOTAL RECOMMENDED $40,599 $44,437 $16,295
91,149
kWh
$7,934
-
MMBtu
$16,370
-
lb
TOTAL IMPLEMENTED $15,928 $18,437 $8,572
74,150
kWh
$7,356
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs