Assessment Year | 1994 |
---|---|
Principal Product | Electroplating & Anodizing of miscellaneous parts |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 110 |
Plant Area |
95,000
ft2
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $322,341 | 2,908,558 |
kWh
|
$0.11 |
Natural Gas | $144,738 | 45,506 |
MMBtu
|
$3.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,548 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,839 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $19,288 | $10,000 | - |
$19,288
-
MMBtu
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $16,124 | $500 | - |
$16,124
-
MMBtu
|
- | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,431 | $1,400 | - |
$1,431
-
MMBtu
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $491 | $1,920 |
$491
4,396
kWh
|
- | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $488 | - |
$488
4,103
kWh
|
- | - | - | |
06 | 3.6112: Use filter and drying oven to reduce sludge volume | $18,227 | $66,000 | - | - |
$18,227
-
lb
|
- | |
07 | 3.1161: Eliminate/reduce an operation | $3,499 | $6,000 | - | - | - |
$3,499
-
lb
|
|
TOTAL RECOMMENDED | $59,548 | $85,820 |
$979
8,499
kWh
|
$36,843
-
MMBtu
|
$18,227
-
lb
|
$3,499
-
lb
|
||
TOTAL IMPLEMENTED | $34,839 | $66,500 |
$488
4,103
kWh
|
$16,124
-
MMBtu
|
$18,227
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs