ITAC Assessment: WI0203
ITAC logo
ITAC Assessment: WI0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product flat-glass working machinery
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 85,000
ft2
Annual Production 550
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,916 681,125
kWh
Natural Gas $22,680 6,211
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,915 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,375

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7221: Lower temperature during the winter season and vice-versa $6,689 $1,400 - $6,689
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,768 $4,650 $3,768
40,739
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,102 $2,259 $1,102
12,016
kWh
- -
04 2.7135: Install occupancy sensors $227 $300 $227
2,345
kWh
- -
05 2.7243: Improve air circulation with destratification fans / other methods $2,743 $2,844 - $2,743
-
MMBtu
-
06 2.3135: Schedule routine maintenance during non-operating periods $1,974 - $1,974
-
kWh
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $422 - $422
-
kWh
- -
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,439 $3,115 - $1,439
-
MMBtu
-
09 2.7447: Install vinyl strip / high speed / air curtain doors $1,175 $1,700 - $1,175
-
MMBtu
-
10 2.6218: Turn off equipment when not in use $590 $200 - $590
-
MMBtu
-
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $286 - $286
6,155
kWh
- -
12 3.1192: Reduce scrap production $2,000 $300 - - $2,000
-
lb
13 3.5314: Use in-process recycling whenever possible $2,500 $500 - - $2,500
-
lb
TOTAL RECOMMENDED $24,915 $17,268 $7,779
61,255
kWh
$12,636
-
MMBtu
$4,500
-
lb
TOTAL IMPLEMENTED $14,375 $10,594 $3,768
40,739
kWh
$10,607
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs