| Assessment Year | 1994 |
|---|---|
| Principal Product | Electrical contractors |
| NAICS |
n/a
|
| SIC | 3537: Industrial Trucks, Tractors, Trailers, and Stackers |
| Sales Range | $5 M to 10M |
| # of Employees | 213 |
| Plant Area |
125,952
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 3,500
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $103,558 | 1,417,937 |
kWh
|
$0.073 |
| Natural Gas | $20,008 | 4,574 |
MMBtu
|
$4.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,034 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,748 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2612: Use cooling tower water instead of refrigeration | $12,890 | $42,825 |
$12,890
236,225
kWh
|
- | - | |
| 02 | 2.7241: Install outside air damper / economizer on hvac unit | $1,873 | $2,800 |
$1,873
25,791
kWh
|
- | - | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $8,555 | $20,000 |
$11,492
157,386
kWh
|
$(-2,937.0)
-
MMBtu
|
- | |
| 04 | 2.6218: Turn off equipment when not in use | $4,040 | $800 |
$4,040
55,393
kWh
|
- | - | |
| 05 | 2.2511: Insulate bare equipment | $287 | $142 |
$287
3,810
kWh
|
- | - | |
| 06 | 2.7224: Reduce space conditioning during non-working hours | $2,906 | $800 | - |
$2,906
-
MMBtu
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,915 | $6,824 |
$2,915
39,859
kWh
|
- | - | |
| 08 | 2.7135: Install occupancy sensors | $470 | $375 |
$470
6,448
kWh
|
- | - | |
| 09 | 2.3132: Recharge batteries on during off-peak demand periods | $2,847 | - |
$2,847
-
kWh
|
- | - | |
| 10 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,643 | - | - | - | $1,643 | |
| 11 | 2.7447: Install vinyl strip / high speed / air curtain doors | $437 | $1,023 | - |
$437
-
MMBtu
|
- | |
| 12 | 2.4221: Install compressor air intakes in coolest locations | $171 | $640 |
$171
2,345
kWh
|
- | - | |
| TOTAL RECOMMENDED | $39,034 | $76,229 |
$36,985
527,257
kWh
|
$406
-
MMBtu
|
$1,643 | ||
| TOTAL IMPLEMENTED | $10,748 | $8,647 |
$5,762
39,859
kWh
|
$3,343
-
MMBtu
|
$1,643 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs