Assessment Year | 1994 |
---|---|
Principal Product | Powered Metal Parts |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $5 M to 10M |
# of Employees | 130 |
Plant Area |
46,000
ft2
|
Annual Production | 10,800,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $176,690 | 4,113,716 |
kWh
|
$0.043 |
Natural Gas | $80,595 | 16,976 |
MMBtu
|
$4.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,610 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $55,055 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4321: Upgrade obsolete equipment | $16,304 | $30,000 |
$16,304
379,836
kWh
|
- | - | |
02 | 2.8113: Purchase gas directly from a contract gas supplier | $33,894 | $500 | - | - | $33,894 | |
03 | 2.2511: Insulate bare equipment | $6,277 | $1,167 |
$6,277
167,644
kWh
|
- | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $1,426 | $200 | - |
$1,426
-
MMBtu
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $3,431 | $960 |
$3,431
80,012
kWh
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,900 | $2,741 |
$1,900
44,256
kWh
|
- | - | |
07 | 2.7135: Install occupancy sensors | $807 | $525 |
$807
18,757
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $167 | $300 |
$167
3,810
kWh
|
- | - | |
09 | 2.3132: Recharge batteries on during off-peak demand periods | $404 | - |
$404
-
kWh
|
- | - | |
TOTAL RECOMMENDED | $64,610 | $36,393 |
$29,290
694,315
kWh
|
$1,426
-
MMBtu
|
$33,894 | ||
TOTAL IMPLEMENTED | $55,055 | $31,660 |
$19,735
459,848
kWh
|
$1,426
-
MMBtu
|
$33,894 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs