ITAC Assessment: OR0219
ITAC logo
ITAC Assessment: OR0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Adhesive String Coating
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 40,000
ft2
Annual Production 4,687,096
lb
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,658 2,259,965
kWh
Natural Gas $11,984 2,198
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,601 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,633

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $697 - $697
31,067
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $936 $165 $936
31,067
kWh
-
03 2.3212: Optimize plant power factor $1,173 $1,600 $1,173
-
kWh
-
04 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $9,795 $34,125 - $9,795
-
MMBtu
TOTAL RECOMMENDED $12,601 $35,890 $2,806
62,134
kWh
$9,795
-
MMBtu
TOTAL IMPLEMENTED $1,633 $165 $1,633
62,134
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs