ITAC Assessment: UA0200
ITAC logo
ITAC Assessment: UA0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Wooden Cabinets
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 145,000
ft2
Annual Production 149,000
units
Production Hrs. Annual 4,290
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,490 2,881,200
kWh
Natural Gas $105,898 10,315
MMBtu
TOTAL YEARLY COSTS $337,388
RECOMMENDED SAVINGS* $50,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,573 $35,360 $22,268
277,156
kWh
$1,305
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,466 $2,082 $6,108
76,019
kWh
$358
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $360 $864 $340
4,232
kWh
$20
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,725 $1,345 $2,574
32,035
kWh
$151
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,552 $100 $1,466
18,247
kWh
$86
06 4.454: Modify startup/shutdown times $15,674 - - $15,674
TOTAL RECOMMENDED $50,350 $39,751 $32,756
407,689
kWh
$17,594
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs