| Assessment Year | 1994 |
|---|---|
| Principal Product | Pumps filters |
| NAICS |
n/a
|
| SIC | 3561: Pumps and Pumping Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 92 |
| Plant Area |
70,000
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $40,314 | 417,351 |
kWh
|
$0.097 |
| Natural Gas | $20,688 | 4,307 |
MMBtu
|
$4.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,220 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,216 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,341 | $4,404 | - |
$2,341
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,005 | $3,657 |
$2,005
20,809
kWh
|
- | |
| 03 | 2.7134: Use photocell controls | $1,159 | $675 |
$1,159
12,016
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $626 | $225 |
$626
6,448
kWh
|
- | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,512 | $500 | - |
$1,512
-
MMBtu
|
|
| 06 | 2.2437: Recover waste heat from equipment | $303 | $500 | - |
$303
-
MMBtu
|
|
| 07 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $490 | $150 |
$490
4,982
kWh
|
- | |
| 08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $245 | $1,400 |
$312
3,224
kWh
|
$(-67.0)
-
MMBtu
|
|
| 09 | 2.3132: Recharge batteries on during off-peak demand periods | $914 | - |
$914
-
kWh
|
- | |
| 10 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $346 | - |
$346
-
kWh
|
- | |
| 11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $170 | - |
$170
1,758
kWh
|
- | |
| 12 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $109 | - |
$109
-
kWh
|
- | |
| TOTAL RECOMMENDED | $10,220 | $11,511 |
$6,131
49,237
kWh
|
$4,089
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,216 | $5,057 |
$4,704
39,273
kWh
|
$1,512
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs