Assessment Year | 1994 |
---|---|
Principal Product | Dock Levelers & Trailer Restraints |
NAICS |
n/a
|
SIC | 3537: Industrial Trucks, Tractors, Trailers, and Stackers |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
100,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $139,039 | 2,172,919 |
kWh
|
$0.064 |
Natural Gas | $126,403 | 25,176 |
MMBtu
|
$5.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,321 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,978 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $21,307 | $17,400 |
$21,307
-
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,291 | $3,946 |
$1,291
20,223
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $247 | $150 |
$247
3,810
kWh
|
- | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $1,037 | $1,050 | - |
$1,037
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $859 | - |
$859
13,482
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $206 | $350 |
$206
3,224
kWh
|
- | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $671 | - |
$671
-
kWh
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $384 | $588 |
$384
5,862
kWh
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $132 | - |
$132
2,052
kWh
|
- | |
10 | 2.2511: Insulate bare equipment | $187 | $660 | - |
$187
-
MMBtu
|
|
TOTAL RECOMMENDED | $26,321 | $24,144 |
$25,097
48,653
kWh
|
$1,224
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,978 | $17,400 |
$21,978
-
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs