ITAC Assessment: WI0184
ITAC logo
ITAC Assessment: WI0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Die Castings
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 70,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $453,062 6,050,117
kWh
Natural Gas $133,354 44,111
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,642

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7111: Reduce illumination to minimum necessary levels $4,627 $8,250 $4,627
61,841
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,777 $3,952 $1,777
23,740
kWh
03 2.7135: Install occupancy sensors $1,425 $225 $1,425
19,050
kWh
04 2.2511: Insulate bare equipment $4,490 $926 $4,490
77,667
kWh
05 2.7241: Install outside air damper / economizer on hvac unit $1,440 $2,800 $1,440
19,637
kWh
06 2.4221: Install compressor air intakes in coolest locations $1,030 $640 $1,030
13,775
kWh
07 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $637 $225 $637
8,499
kWh
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $162 - $162
2,052
kWh
TOTAL RECOMMENDED $15,588 $17,018 $15,588
226,261
kWh
TOTAL IMPLEMENTED $4,642 $6,977 $4,642
62,427
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs