Assessment Year | 1993 |
---|---|
Principal Product | Conveyor belts for the food industry |
NAICS |
n/a
|
SIC | 3535: Conveyors and Conveying Equipment |
Sales Range | $10 M to 50M |
# of Employees | 79 |
Plant Area |
75,000
ft2
|
Annual Production | 2,500
thousand feet
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,079 | 742,380 |
kWh
|
$0.088 |
Natural Gas | $40,997 | 12,595 |
MMBtu
|
$3.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,098 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,671 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $10,455 | $8,000 | - |
$10,455
-
MMBtu
|
|
02 | 2.7221: Lower temperature during the winter season and vice-versa | $2,259 | - | - |
$2,259
-
MMBtu
|
|
03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $2,118 | $675 |
$2,118
24,326
kWh
|
- | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $1,672 | $4,650 | - |
$1,672
-
MMBtu
|
|
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,329 | - |
$1,329
15,240
kWh
|
- | |
06 | 2.6218: Turn off equipment when not in use | $972 | $800 | - |
$972
-
MMBtu
|
|
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $740 | $1,584 | - |
$740
-
MMBtu
|
|
08 | 2.7135: Install occupancy sensors | $331 | $200 |
$331
3,810
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $222 | $444 |
$222
2,638
kWh
|
- | |
TOTAL RECOMMENDED | $20,098 | $16,353 |
$4,000
46,014
kWh
|
$16,098
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,671 | $6,234 | - |
$4,671
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs