ITAC Assessment: TN0583
ITAC logo
ITAC Assessment: TN0583
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Hamburger and hot dog buns
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 28,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,369 4,355,217
kWh
Electricity Demand $69,342 8,000
kW-mo/yr
Natural Gas $168,224 43,182
MMBtu
LPG $14,218 2,430
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $736,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $715

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 3.1182: Make a new by-product $723,960 $390,800 - - - - $(-47,040.0)
-
lb
$(-75,000.0) $(-50,000.0) $896,000
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $9,110 $16,600 $(-50.0)
(-1,758)
kWh
- - - $9,410
-
lb
$(-250.0) - -
03 2.1221: Replace obsolete burners with more efficient ones $1,824 $3,000 - - $1,682
-
MMBtu
$142
-
MMBtu
- - - -
04 2.4221: Install compressor air intakes in coolest locations $715 $260 $378
12,603
kWh
$337
-
kW-mo/yr
- - - - - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $329 $300 - - $329
-
MMBtu
- - - - -
06 2.2122: Install / repair insulation on condensate lines $189 $236 - - $189
-
MMBtu
- - - - -
TOTAL RECOMMENDED $736,127 $411,196 $328
10,845
kWh
$337
-
kW-mo/yr
$2,200
-
MMBtu
$142
-
MMBtu
$(-37,630.0)
-
lb
$(-75,250.0) $(-50,000.0) $896,000
TOTAL IMPLEMENTED $715 $260 $378
12,603
kWh
$337
-
kW-mo/yr
- - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs