ITAC Assessment: UD0141
ITAC logo
ITAC Assessment: UD0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product CATTLE FEEDS/ANIMAL FATS
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 104
Plant Area
n/a
Annual Production 90,000
ton
Production Hrs. Annual 4,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,466 2,131,008
kWh
Natural Gas $107,053 19,162
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,814 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,366

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $2,873 $4,000 $2,873
51,583
kWh
- -
02 2.2511: Insulate bare equipment $10,040 $7,500 - $10,040
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,776 $4,165 $4,420
83,822
kWh
$(-446.0)
-
MMBtu
$2,802
04 2.6218: Turn off equipment when not in use $9,326 $400 $32
1,172
kWh
$9,294
-
MMBtu
-
05 2.2511: Insulate bare equipment $2,799 $1,000 - $2,799
-
MMBtu
-
TOTAL RECOMMENDED $31,814 $17,065 $7,325
136,577
kWh
$21,687
-
MMBtu
$2,802
TOTAL IMPLEMENTED $19,366 $7,900 $32
1,172
kWh
$19,334
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs