ITAC Assessment: WI0174
ITAC logo
ITAC Assessment: WI0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Screw machine products
NAICS
n/a
SIC 3451: Screw Machine Products
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 100,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,875
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,075 2,349,648
kWh
Natural Gas $3,094 838
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,958 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,898

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7226: Use computer programs to optimize hvac performance $2,356 $6,000 $2,356
31,067
kWh
- -
02 2.6121: Reduce hot water temperature to the minimum required $1,898 - $1,898
24,619
kWh
- -
03 2.7224: Reduce space conditioning during non-working hours $1,038 $600 - $1,038
-
MMBtu
-
04 2.7135: Install occupancy sensors $1,642 $1,000 $1,642
21,395
kWh
- -
05 2.7111: Reduce illumination to minimum necessary levels $1,315 - $1,315
16,999
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,100 $1,559 $1,100
14,361
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $914 - $914
12,016
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $908 $960 $908
11,723
kWh
- -
09 2.8113: Purchase gas directly from a contract gas supplier $787 $500 - - $787
TOTAL RECOMMENDED $11,958 $10,619 $10,133
132,180
kWh
$1,038
-
MMBtu
$787
TOTAL IMPLEMENTED $1,898 - $1,898
24,619
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs