| Assessment Year | 1993 |
|---|---|
| Principal Product | Screw machine products |
| NAICS |
n/a
|
| SIC | 3451: Screw Machine Products |
| Sales Range | $10 M to 50M |
| # of Employees | 180 |
| Plant Area |
100,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,875
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $181,075 | 2,349,648 |
kWh
|
$0.077 |
| Natural Gas | $3,094 | 838 |
MMBtu
|
$3.69 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,958 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,898 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7226: Use computer programs to optimize hvac performance | $2,356 | $6,000 |
$2,356
31,067
kWh
|
- | - | |
| 02 | 2.6121: Reduce hot water temperature to the minimum required | $1,898 | - |
$1,898
24,619
kWh
|
- | - | |
| 03 | 2.7224: Reduce space conditioning during non-working hours | $1,038 | $600 | - |
$1,038
-
MMBtu
|
- | |
| 04 | 2.7135: Install occupancy sensors | $1,642 | $1,000 |
$1,642
21,395
kWh
|
- | - | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $1,315 | - |
$1,315
16,999
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,100 | $1,559 |
$1,100
14,361
kWh
|
- | - | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $914 | - |
$914
12,016
kWh
|
- | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $908 | $960 |
$908
11,723
kWh
|
- | - | |
| 09 | 2.8113: Purchase gas directly from a contract gas supplier | $787 | $500 | - | - | $787 | |
| TOTAL RECOMMENDED | $11,958 | $10,619 |
$10,133
132,180
kWh
|
$1,038
-
MMBtu
|
$787 | ||
| TOTAL IMPLEMENTED | $1,898 | - |
$1,898
24,619
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs