ITAC Assessment: WI0171
ITAC logo
ITAC Assessment: WI0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Filament wound composites
NAICS
n/a
SIC 3082: Unsupported Plastics Profile Shapes
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 90,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,441 2,719,812
kWh
Natural Gas $25,563 4,606
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,659 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,673

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $28,629 $90,000 $49,553
883,939
kWh
$(-20,924.0)
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,354 $1,769 - $1,354
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,095 $1,481 $1,095
19,637
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $220 - $220
3,810
kWh
-
05 2.2511: Insulate bare equipment $951 $3,232 - $951
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $805 $1,606 $805
14,361
kWh
-
07 2.7135: Install occupancy sensors $737 $1,800 $737
13,189
kWh
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $522 $375 - $522
-
MMBtu
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $346 - $346
6,155
kWh
-
TOTAL RECOMMENDED $34,659 $100,263 $52,756
941,091
kWh
$(-18,097.0)
-
MMBtu
TOTAL IMPLEMENTED $1,673 $1,981 $1,151
20,516
kWh
$522
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs