ITAC Assessment: WI0159
ITAC logo
ITAC Assessment: WI0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CORRUGATED PIPES
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 3,500
ton
Production Hrs. Annual 2,375
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,787 262,896
kWh
Natural Gas $19,074 4,721
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,598 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,356

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $2,686 $1,850 $(-142.0)
(-2,345)
kWh
$2,828
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,224 $500 - $1,224
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,058 $1,431 $1,058
16,706
kWh
- -
04 2.8121: Apply for tax-free status for energy purchases $498 - $366
-
kWh
$132
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $132 $646 $176
2,638
kWh
- $(-44.0)
TOTAL RECOMMENDED $5,598 $4,427 $1,458
16,999
kWh
$4,184
-
MMBtu
$(-44.0)
TOTAL IMPLEMENTED $1,356 $1,146 $176
2,638
kWh
$1,224
-
MMBtu
$(-44.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs