Assessment Year | 1992 |
---|---|
Principal Product | PUMPS |
NAICS |
n/a
|
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 25,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $111,755 | 1,744,138 |
kWh
|
$0.064 |
Natural Gas | $49,431 | 10,816 |
MMBtu
|
$4.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,372 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,199 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,381 | - |
$5,881
-
kWh
|
- | $(-1,500.0) | |
02 | 2.8121: Apply for tax-free status for energy purchases | $4,154 | - |
$3,926
-
kWh
|
$228
-
MMBtu
|
- | |
03 | 2.3212: Optimize plant power factor | $3,161 | $8,000 |
$3,161
-
kWh
|
- | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $5,382 | - |
$5,382
84,115
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $663 | $2,555 |
$781
12,309
kWh
|
- | $(-118.0) | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,099 | $1,400 |
$1,579
24,619
kWh
|
$(-480.0)
-
MMBtu
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $532 | $1,800 |
$532
8,206
kWh
|
- | - | |
TOTAL RECOMMENDED | $19,372 | $13,755 |
$21,242
129,249
kWh
|
$(-252.0)
-
MMBtu
|
$(-1,618.0) | ||
TOTAL IMPLEMENTED | $10,199 | $2,555 |
$10,089
96,424
kWh
|
$228
-
MMBtu
|
$(-118.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs