Assessment Year | 1992 |
---|---|
Principal Product | COOKIES AND CRACKERS |
NAICS |
n/a
|
SIC | 2052: Cookies and Crackers |
Sales Range | $50 M to 100M |
# of Employees | 390 |
Plant Area |
n/a
|
Annual Production | 54,000,000
lb
|
Production Hrs. Annual | 5,525
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $448,812 | 6,551,290 |
kWh
|
$0.069 |
Natural Gas | $234,555 | 89,318 |
MMBtu
|
$2.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,983 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,068 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,588 | - |
$5,420
79,132
kWh
|
- | $(-832.0) | |
02 | 2.3132: Recharge batteries on during off-peak demand periods | $6,926 | $30,000 |
$6,926
-
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $3,906 | $2,140 |
$3,906
55,686
kWh
|
- | - | |
04 | 2.2525: Eliminate cooling of process streams which subsequently must be heated and vice versa | $2,665 | $200 |
$2,665
38,980
kWh
|
- | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,513 | $500 | - |
$1,513
-
MMBtu
|
- | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $1,444 | - | - |
$1,444
-
MMBtu
|
- | |
07 | 2.7261: Install timers and/or thermostats | $555 | $400 | - |
$555
-
MMBtu
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,386 | $3,640 |
$1,386
20,223
kWh
|
- | - | |
TOTAL RECOMMENDED | $22,983 | $36,880 |
$20,303
194,021
kWh
|
$3,512
-
MMBtu
|
$(-832.0) | ||
TOTAL IMPLEMENTED | $2,068 | $900 | - |
$2,068
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs