| Assessment Year | 1991 |
|---|---|
| Principal Product | CHEESE |
| NAICS |
n/a
|
| SIC | 2022: Natural, Processed, and Imitation Cheese |
| Sales Range | $10 M to 50M |
| # of Employees | 70 |
| Plant Area |
n/a
|
| Annual Production | 70,000,000
lb
|
| Production Hrs. Annual | 7,000
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $53,258 | 937,866 |
kWh
|
$0.057 |
| Natural Gas | $57,339 | 11,797 |
MMBtu
|
$4.86 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,854 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.8113: Purchase gas directly from a contract gas supplier | $18,289 | $500 | - |
$18,289
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,641 | $2,520 |
$4,641
81,770
kWh
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,486 | $500 | - |
$2,486
-
MMBtu
|
|
| 04 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $229 | $52 | - |
$229
-
MMBtu
|
|
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $205 | - |
$205
3,517
kWh
|
- | |
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $161 | - |
$161
2,931
kWh
|
- | |
| 07 | 2.6121: Reduce hot water temperature to the minimum required | $127 | - |
$127
2,345
kWh
|
- | |
| 08 | 2.7261: Install timers and/or thermostats | $72 | $200 | - |
$72
-
MMBtu
|
|
| 09 | 2.2691: Shut off cooling if cold outside air will cool process | $1,644 | $6,000 |
$1,644
29,015
kWh
|
- | |
| TOTAL RECOMMENDED | $27,854 | $9,772 |
$6,778
119,578
kWh
|
$21,076
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs