Assessment Year | 1991 |
---|---|
Principal Product | TOOL BOXES |
NAICS |
n/a
|
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 1,090
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $333,852 | 4,475,088 |
kWh
|
$0.075 |
Natural Gas | $171,822 | 44,277 |
MMBtu
|
$3.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,276 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,276 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,375 | $1,250 | - |
$5,375
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,925 | $2,980 |
$1,925
25,791
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $3,338 | $2,250 |
$3,338
44,842
kWh
|
- | - | |
04 | 2.7226: Use computer programs to optimize hvac performance | $3,427 | $2,100 |
$3,427
46,014
kWh
|
- | - | |
05 | 2.3132: Recharge batteries on during off-peak demand periods | $765 | - |
$765
-
kWh
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $332 | - | - |
$432
-
MMBtu
|
$(-100.0) | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $72 | $160 |
$72
879
kWh
|
- | - | |
08 | 2.2414: Use waste heat from hot flue gases to preheat | $3,042 | $5,000 | - |
$3,042
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $18,276 | $13,740 |
$9,527
117,526
kWh
|
$8,849
-
MMBtu
|
$(-100.0) | ||
TOTAL IMPLEMENTED | $18,276 | $13,740 |
$9,527
117,526
kWh
|
$8,849
-
MMBtu
|
$(-100.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs