ITAC Assessment: WI0107
ITAC logo
ITAC Assessment: WI0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product TOOL BOXES
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 1,090
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $333,852 4,475,088
kWh
Natural Gas $171,822 44,277
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,276 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,276

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $5,375 $1,250 - $5,375
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,925 $2,980 $1,925
25,791
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $3,338 $2,250 $3,338
44,842
kWh
- -
04 2.7226: Use computer programs to optimize hvac performance $3,427 $2,100 $3,427
46,014
kWh
- -
05 2.3132: Recharge batteries on during off-peak demand periods $765 - $765
-
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $332 - - $432
-
MMBtu
$(-100.0)
07 2.6212: Turn off equipment during breaks, reduce operating time $72 $160 $72
879
kWh
- -
08 2.2414: Use waste heat from hot flue gases to preheat $3,042 $5,000 - $3,042
-
MMBtu
-
TOTAL RECOMMENDED $18,276 $13,740 $9,527
117,526
kWh
$8,849
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED $18,276 $13,740 $9,527
117,526
kWh
$8,849
-
MMBtu
$(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs