ITAC Assessment: WI0096
ITAC logo
ITAC Assessment: WI0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product AUTOMOTIVE TIRES
NAICS
n/a
SIC 3011: Tires and Inner Tubes
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 2,375
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,766 1,456,624
kWh
Natural Gas $65,912 18,666
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $120,651 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,137

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $77,488 $400,000 $97,696
949,883
kWh
$(-20,208.0)
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $27,714 - $29,139
-
kWh
- $(-1,425.0)
03 2.7243: Improve air circulation with destratification fans / other methods $8,473 $3,895 $(-386.0)
(-3,810)
kWh
$8,859
-
MMBtu
-
04 2.3132: Recharge batteries on during off-peak demand periods $5,068 $800 $5,068
-
kWh
- -
05 2.6121: Reduce hot water temperature to the minimum required $563 - $563
5,569
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $560 $500 - $560
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $449 $1,744 $449
4,396
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $24 $14 $24
586
kWh
- -
09 2.6232: Install set-back timers $160 $400 $160
1,465
kWh
- -
10 2.2511: Insulate bare equipment $152 $352 - $152
-
MMBtu
-
TOTAL RECOMMENDED $120,651 $407,705 $132,713
958,089
kWh
$(-10,637.0)
-
MMBtu
$(-1,425.0)
TOTAL IMPLEMENTED $15,137 $6,953 $5,718
6,741
kWh
$9,419
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings