ITAC Assessment: UD0939
ITAC logo
ITAC Assessment: UD0939
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Propellers
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 260
Plant Area 182,000
ft2
Annual Production 200,000
units
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $383,295 8,164,550
kWh
Electricity Demand $268,829 17,436
kW-mo/yr
Electricity Fees $1,962 -
Natural Gas $121,482 22,752
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,169 - $752
16,494
kWh
$417
-
kW-mo/yr
- - - - -
02 2.8112: Combine utility meters $10,737 - - - $11,337 - - - $(-600.0)
03 3.4116: Meter recycled water (to reduce sewer charges) $369 $700 - - - - $369
-
Tgal
- -
04 2.2437: Recover waste heat from equipment $4,358 $400 $(-624.0)
(-13,700)
kWh
$(-49.0)
-
kW-mo/yr
- $5,031
-
MMBtu
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,740 $1,000 $1,940
42,569
kWh
$1,000
-
kW-mo/yr
- - - $(-1,200.0) -
06 2.4239: Eliminate or reduce compressed air usage $164 $375 $6
139
kWh
$158
-
kW-mo/yr
- - - - -
07 2.7135: Install occupancy sensors $1,588 $1,013 $1,238
27,169
kWh
- - - - $350 -
08 2.7144: Install spectral reflectors / delamp $1,699 $315 $924
20,275
kWh
$512
-
kW-mo/yr
- - - $263 -
09 2.2514: Cover open tanks $1,526 $740 $999
21,924
kWh
$527
-
kW-mo/yr
- - - - -
10 2.2514: Cover open tanks $612 $600 $394
8,640
kWh
$218
-
kW-mo/yr
- - - - -
11 2.4323: Use optimum size and capacity equipment $1,321 $6,500 $850
18,650
kWh
$471
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $25,283 $11,643 $6,479
142,160
kWh
$3,254
-
kW-mo/yr
$11,337 $5,031
-
MMBtu
$369
-
Tgal
$(-587.0) $(-600.0)
TOTAL IMPLEMENTED $6,360 $2,703 $4,860
106,646
kWh
$2,087
-
kW-mo/yr
- - - $(-587.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs