| Assessment Year | 1989 |
|---|---|
| Principal Product | BEVERAGE DISPENSING EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $210,640 | 2,994,431 |
kWh
|
$0.070 |
| Natural Gas | $114,704 | 23,395 |
MMBtu
|
$4.90 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $87,603 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $81,760 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8113: Purchase gas directly from a contract gas supplier | $35,807 | - | - |
$35,807
-
MMBtu
|
- | |
| 02 | 2.7261: Install timers and/or thermostats | $34,447 | $11,000 | - |
$34,447
-
MMBtu
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,617 | $12,685 |
$2,617
12,309
kWh
|
- | - | |
| 04 | 2.3191: Use demand controller or load shedder | $5,544 | $5,000 |
$5,544
-
kWh
|
- | - | |
| 05 | 2.3132: Recharge batteries on during off-peak demand periods | $2,914 | - |
$2,914
-
kWh
|
- | - | |
| 06 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $1,809 | $2,000 |
$919
13,189
kWh
|
$890
-
MMBtu
|
- | |
| 07 | 2.7226: Use computer programs to optimize hvac performance | $1,681 | $5,000 |
$1,681
24,033
kWh
|
- | - | |
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,664 | $500 | - |
$2,054
-
MMBtu
|
$(-390.0) | |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,120 | - |
$1,120
15,826
kWh
|
- | - | |
| TOTAL RECOMMENDED | $87,603 | $36,185 |
$14,795
65,357
kWh
|
$73,198
-
MMBtu
|
$(-390.0) | ||
| TOTAL IMPLEMENTED | $81,760 | $34,185 |
$9,842
36,342
kWh
|
$72,308
-
MMBtu
|
$(-390.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs