ITAC Assessment: WI0055
ITAC logo
ITAC Assessment: WI0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ICE CREAM TOPPINGS
NAICS
n/a
SIC 2066: Chocolate and Cocoa Products
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area
n/a
Annual Production 62,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $356,134 7,857,562
kWh
Natural Gas $199,102 50,961
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,877 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,849

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $40,435 - - $40,435
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,520 - $16,920
-
kWh
- $(-2,400.0)
03 2.4312: Improve lubrication practices $8,793 $713 $8,793
199,590
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,476 $8,464 $1,476
33,411
kWh
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $5,852 $7,000 - $5,852
-
MMBtu
-
06 2.3132: Recharge batteries on during off-peak demand periods $4,976 - $4,976
-
kWh
- -
07 2.7494: Install storm windows and doors $1,472 $2,444 - $1,472
-
MMBtu
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,325 - $1,325
30,188
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $1,028 $3,000 $1,028
23,447
kWh
- -
TOTAL RECOMMENDED $79,877 $21,621 $34,518
286,636
kWh
$47,759
-
MMBtu
$(-2,400.0)
TOTAL IMPLEMENTED $78,849 $18,621 $33,490
263,189
kWh
$47,759
-
MMBtu
$(-2,400.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs