ITAC Assessment: WI0051
ITAC logo
ITAC Assessment: WI0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product FASTENERS
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 195
Plant Area
n/a
Annual Production 10,800,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $404,587 6,677,315
kWh
Natural Gas $151,934 149,396
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $146,721 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $9,567 - $9,567
157,972
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,458 - $2,458
40,445
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,788 $5,246 $2,788
46,014
kWh
-
04 2.3191: Use demand controller or load shedder $12,672 $5,000 $12,672
-
kWh
-
05 2.3132: Recharge batteries on during off-peak demand periods $13,401 - $13,401
335,873
kWh
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $100,358 $40,000 $101,820
1,680,246
kWh
$(-1,462.0)
-
MMBtu
07 2.2414: Use waste heat from hot flue gases to preheat $2,417 $5,000 - $2,417
-
MMBtu
08 2.7261: Install timers and/or thermostats $3,060 $14,250 - $3,060
-
MMBtu
TOTAL RECOMMENDED $146,721 $69,496 $142,706
2,260,550
kWh
$4,015
-
MMBtu
TOTAL IMPLEMENTED $21,707 $19,496 $18,647
422,332
kWh
$3,060
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs