| Assessment Year | 1989 |
|---|---|
| Principal Product | FASTENERS |
| NAICS |
n/a
|
| SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
| Sales Range | $10 M to 50M |
| # of Employees | 195 |
| Plant Area |
n/a
|
| Annual Production | 10,800,000
lb
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $404,587 | 6,677,315 |
kWh
|
$0.061 |
| Natural Gas | $151,934 | 149,396 |
MMBtu
|
$1.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $146,721 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,707 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4312: Improve lubrication practices | $9,567 | - |
$9,567
157,972
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,458 | - |
$2,458
40,445
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,788 | $5,246 |
$2,788
46,014
kWh
|
- | |
| 04 | 2.3191: Use demand controller or load shedder | $12,672 | $5,000 |
$12,672
-
kWh
|
- | |
| 05 | 2.3132: Recharge batteries on during off-peak demand periods | $13,401 | - |
$13,401
335,873
kWh
|
- | |
| 06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $100,358 | $40,000 |
$101,820
1,680,246
kWh
|
$(-1,462.0)
-
MMBtu
|
|
| 07 | 2.2414: Use waste heat from hot flue gases to preheat | $2,417 | $5,000 | - |
$2,417
-
MMBtu
|
|
| 08 | 2.7261: Install timers and/or thermostats | $3,060 | $14,250 | - |
$3,060
-
MMBtu
|
|
| TOTAL RECOMMENDED | $146,721 | $69,496 |
$142,706
2,260,550
kWh
|
$4,015
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $21,707 | $19,496 |
$18,647
422,332
kWh
|
$3,060
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs