ITAC Assessment: WI0049
ITAC logo
ITAC Assessment: WI0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CARBON PAPER
NAICS
n/a
SIC 3955: Carbon Paper and Inked Ribbons
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area
n/a
Annual Production 24,500,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,141 2,117,233
kWh
Natural Gas $117,682 26,204
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,436 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,867

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $3,771 - $3,771
41,911
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,886 - $1,886
21,102
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,226 $3,188 $1,226
13,482
kWh
-
04 2.3191: Use demand controller or load shedder $4,260 $5,000 $4,260
-
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,176 $1,400 - $2,176
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $806 $175 - $806
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,228 $350 - $1,228
-
MMBtu
08 2.2414: Use waste heat from hot flue gases to preheat $2,083 $5,000 - $2,083
-
MMBtu
TOTAL RECOMMENDED $17,436 $15,113 $11,143
76,495
kWh
$6,293
-
MMBtu
TOTAL IMPLEMENTED $9,867 $1,925 $5,657
63,013
kWh
$4,210
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs