Assessment Year | 1988 |
---|---|
Principal Product | HYDRAULIC CYLINDERS |
NAICS |
n/a
|
SIC | 3593: Fluid Power Cylinders and Actuators |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
n/a
|
Annual Production | 6,000
pieces
|
Production Hrs. Annual | 4,675
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $120,395 | 1,890,973 |
kWh
|
$0.064 |
Natural Gas | $33,512 | 6,468 |
MMBtu
|
$5.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,186 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,615 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4312: Improve lubrication practices | $4,529 | - |
$4,529
71,219
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,402 | - |
$1,402
21,981
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $793 | $234 |
$793
12,603
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $824 | $500 | - |
$1,124
-
MMBtu
|
$(-300.0) | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $751 | $1,300 |
$1,150
18,171
kWh
|
$(-399.0)
-
MMBtu
|
- | |
06 | 2.3191: Use demand controller or load shedder | $2,820 | $5,000 |
$2,820
-
kWh
|
- | - | |
07 | 2.3132: Recharge batteries on during off-peak demand periods | $4,459 | - |
$4,459
-
kWh
|
- | - | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,608 | $5,500 | - |
$4,808
-
MMBtu
|
$(-200.0) | |
TOTAL RECOMMENDED | $20,186 | $12,534 |
$15,153
123,974
kWh
|
$5,533
-
MMBtu
|
$(-500.0) | ||
TOTAL IMPLEMENTED | $16,615 | $6,234 |
$11,183
105,803
kWh
|
$5,932
-
MMBtu
|
$(-500.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs