ITAC Assessment: LT0111
ITAC logo
ITAC Assessment: LT0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product POLYETHYLENE BAGS
NAICS
n/a
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 7,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,032 3,696,073
kWh
Natural Gas $33,144 6,008
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,771 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,333

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $982 $314 $1,172
31,653
kWh
- $(-190.0)
02 2.7261: Install timers and/or thermostats $455 $60 $157
5,275
kWh
$298
-
MMBtu
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $988 $180 $988
33,705
kWh
- -
04 2.2437: Recover waste heat from equipment $3,480 $4,900 - $3,480
-
MMBtu
-
05 2.7231: Use radiant heater for spot heating $4,450 $8,000 - $4,450
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $416 $286 $583
13,189
kWh
- $(-167.0)
TOTAL RECOMMENDED $10,771 $13,740 $2,900
83,822
kWh
$8,228
-
MMBtu
$(-357.0)
TOTAL IMPLEMENTED $5,333 $5,560 $1,912
50,117
kWh
$3,778
-
MMBtu
$(-357.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs