Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FIBER PARTITIONS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 110,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,041 1,436,987
kWh
Natural Gas $33,142 6,720
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,405

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4312: Improve lubrication practices $1,906 - $1,906
30,188
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $694 $700 $1,039
16,413
kWh
$(-345.0)
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,392 $534 $1,392
21,981
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,013 $2,000 $1,013
16,120
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $574 $500 - $874
-
MMBtu
$(-300.0)
TOTAL RECOMMENDED $5,579 $3,734 $5,350
84,702
kWh
$529
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $2,405 $2,534 $2,405
38,101
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs