ITAC Assessment: WI0031
ITAC logo
ITAC Assessment: WI0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product STAMPINGS AND WASHERS
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area
n/a
Annual Production 28,000,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,261 3,749,121
kWh
Natural Gas $88,998 22,279
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,128 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,706

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $4,758 $3,500 - $4,758
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,808 $500 - $1,908
-
MMBtu
$(-100.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,157 $454 $1,157
22,567
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $2,548 $2,500 $2,548
49,824
kWh
- -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,507 - $2,707
-
kWh
- $(-1,200.0)
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,350 $2,300 $2,021
39,566
kWh
$(-671.0)
-
MMBtu
-
TOTAL RECOMMENDED $13,128 $9,254 $8,433
111,957
kWh
$5,995
-
MMBtu
$(-1,300.0)
TOTAL IMPLEMENTED $5,706 $5,300 $4,569
89,390
kWh
$1,237
-
MMBtu
$(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs