Assessment Year | 2006 |
---|---|
Principal Product | Food additives |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 35 |
Plant Area |
45,820
ft2
|
Annual Production | 84,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $339,915 | 11,460,000 |
kWh
|
$0.030 |
Electricity Demand | $402,278 | 17,987 |
kW-mo/yr
|
$22.36 |
Electricity Fees | $600 | - |
|
- |
Natural Gas | $1,577,828 | 287,188 |
MMBtu
|
$5.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,480 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $22,910 | $60,580 | - | - |
$22,910
-
MMBtu
|
|
02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $6,180 | $60 | - | - |
$6,180
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,750 | $120 |
$2,820
94,100
kWh
|
$2,930
-
kW-mo/yr
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $1,190 | $1,402 |
$580
19,336
kWh
|
$610
-
kW-mo/yr
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,790 | $6,950 |
$1,860
62,000
kWh
|
$1,930
-
kW-mo/yr
|
- | |
06 | 2.2136: Install / repair insulation on steam lines | $3,030 | $1,920 | - | - |
$3,030
-
MMBtu
|
|
07 | 2.4131: Size electric motors for peak operating efficiency | $1,550 | $6,000 |
$760
25,400
kWh
|
$790
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $44,400 | $77,032 |
$6,020
200,836
kWh
|
$6,260
-
kW-mo/yr
|
$32,120
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,480 | $6,180 |
$3,580
119,500
kWh
|
$3,720
-
kW-mo/yr
|
$6,180
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs