ITAC Assessment: CO0593
ITAC logo
ITAC Assessment: CO0593
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Food additives
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 45,820
ft2
Annual Production 84,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $339,915 11,460,000
kWh
Electricity Demand $402,278 17,987
kW-mo/yr
Electricity Fees $600 -
Natural Gas $1,577,828 287,188
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $22,910 $60,580 - - $22,910
-
MMBtu
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $6,180 $60 - - $6,180
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,750 $120 $2,820
94,100
kWh
$2,930
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $1,190 $1,402 $580
19,336
kWh
$610
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,790 $6,950 $1,860
62,000
kWh
$1,930
-
kW-mo/yr
-
06 2.2136: Install / repair insulation on steam lines $3,030 $1,920 - - $3,030
-
MMBtu
07 2.4131: Size electric motors for peak operating efficiency $1,550 $6,000 $760
25,400
kWh
$790
-
kW-mo/yr
-
TOTAL RECOMMENDED $44,400 $77,032 $6,020
200,836
kWh
$6,260
-
kW-mo/yr
$32,120
-
MMBtu
TOTAL IMPLEMENTED $13,480 $6,180 $3,580
119,500
kWh
$3,720
-
kW-mo/yr
$6,180
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs