ITAC Assessment: GT0869
ITAC logo
ITAC Assessment: GT0869
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Resilient Flooring
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3996: Linoleum, Asphalted-Felt-Base, and Other Hard Surface Floor Coverings, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 62
Plant Area 73,000
ft2
Annual Production 19,000
thousand feet
Production Hrs. Annual 5,952
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,892 3,536,390
kWh
Electricity Demand $77,738 9,112
kW-mo/yr
Natural Gas $286,342 18,715
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,392 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,185

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $7,130 $2,100 - - $7,130
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $352 - $254
4,880
kWh
$98
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,117 $890 $743
14,298
kWh
$374
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $5,201 $900 $3,753
72,175
kWh
$1,448
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $11,586 $42,920 $8,356
160,700
kWh
$3,230
-
kW-mo/yr
-
06 2.2414: Use waste heat from hot flue gases to preheat $23,715 $17,250 - - $23,715
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,291 $4,515 $2,059
39,600
kWh
$1,232
-
kW-mo/yr
-
TOTAL RECOMMENDED $52,392 $68,575 $15,165
291,653
kWh
$6,382
-
kW-mo/yr
$30,845
-
MMBtu
TOTAL IMPLEMENTED $20,185 $45,910 $9,353
179,878
kWh
$3,702
-
kW-mo/yr
$7,130
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs