ITAC Assessment: TN0302
ITAC logo
ITAC Assessment: TN0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product AEROSPACE MACHINE PARTS
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 170
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,718
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,395 1,812,134
kWh
LPG $1,003 92
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,570 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,570

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,791 $6,512 $4,791
78,546
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,877 - $1,877
30,774
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $874 $150 $874
14,361
kWh
-
04 2.6232: Install set-back timers $822 - $822
13,482
kWh
-
05 2.7243: Improve air circulation with destratification fans / other methods $9 - $(-95.0)
(-1,465)
kWh
$104
-
MMBtu
06 2.2511: Insulate bare equipment $197 $184 $197
3,224
kWh
-
TOTAL RECOMMENDED $8,570 $6,846 $8,466
138,922
kWh
$104
-
MMBtu
TOTAL IMPLEMENTED $8,570 $6,846 $8,466
138,922
kWh
$104
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs