ITAC Assessment: GT0994
ITAC logo
ITAC Assessment: GT0994
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Commercial Refrigeration Display Cases
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 2599: Furniture and Fixtures, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 319
Plant Area 297,268
ft2
Annual Production 13,823
units
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $825,163 7,571,777
kWh
Electricity Fees $2,166 -
Natural Gas $158,597 21,848
MMBtu
Other Gas $19,477 1
MMBtu
TOTAL YEARLY COSTS $1,005,403
RECOMMENDED SAVINGS* $404,660 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Other Gas Savings Personnel Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $17,891 $200 - - $17,891
-
MMBtu
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $12,462 $400 $12,462
114,333
kWh
- - -
03 2.7224: Reduce space conditioning during non-working hours $12,243 $1,650 $12,243
112,318
kWh
- - -
04 2.4239: Eliminate or reduce compressed air usage $2,390 $1,000 $2,390
21,931
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,752 $1,850 $6,652
61,031
kWh
- - $(-2,900.0)
06 2.3212: Optimize plant power factor $2,063 $8,907 - $2,063 - -
07 2.9114: Use solar heat to make electricty $353,859 $1,694,463 $353,859
3,247,663
kWh
- - -
TOTAL RECOMMENDED $404,660 $1,708,470 $387,606
3,557,276
kWh
$2,063 $17,891
-
MMBtu
$(-2,900.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Other Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs