Assessment Year | 1988 |
---|---|
Principal Product | FLEXIBLE PACKAGING |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $196,548 | 3,903,283 |
kWh
|
$0.050 |
Natural Gas | $120,498 | 24,951 |
MMBtu
|
$4.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,029 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,522 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4312: Improve lubrication practices | $5,446 | - |
$5,446
108,148
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,450 | - |
$2,450
48,652
kWh
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $890 | $1,400 |
$1,505
29,894
kWh
|
$(-615.0)
-
MMBtu
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $1,627 | $700 |
$1,627
32,239
kWh
|
- | |
05 | 2.6121: Reduce hot water temperature to the minimum required | $171 | - | - |
$171
-
MMBtu
|
|
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $445 | $500 | - |
$445
-
MMBtu
|
|
TOTAL RECOMMENDED | $11,029 | $2,600 |
$11,028
218,933
kWh
|
$1
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,522 | $1,200 |
$4,077
80,891
kWh
|
$445
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs