ITAC Assessment: UM0023
ITAC logo
ITAC Assessment: UM0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Lubricants and Oils
NAICS
n/a
SIC 2992: Lubricating Oils and Greases
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 42,000
ft2
Annual Production 6,400
Tgal
Production Hrs. Annual 2,080
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,146 339,390
kWh
Natural Gas $64,307 13,007
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,071 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,514

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,365 $9,035 $3,365
32,532
kWh
-
02 2.2514: Cover open tanks $12,514 $13,088 - $12,514
-
MMBtu
03 2.1213: Direct warmest air to combustion intake $684 $200 - $684
-
MMBtu
04 2.2511: Insulate bare equipment $2,370 $481 - $2,370
-
MMBtu
05 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $3,126 $1,990 - $3,126
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $3,012 $471 - $3,012
-
MMBtu
TOTAL RECOMMENDED $25,071 $25,265 $3,365
32,532
kWh
$21,706
-
MMBtu
TOTAL IMPLEMENTED $12,514 $13,088 - $12,514
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs