ITAC Assessment: WI0023
ITAC logo
ITAC Assessment: WI0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MACHINES - CUTTING TYPE
NAICS
n/a
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 200
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,031 1,405,627
kWh
Natural Gas $54,680 15,010
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,086 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,406

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4312: Improve lubrication practices $2,680 - $2,680
34,584
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $327 $500 $327
4,103
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $259 $163 $259
3,224
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $716 $500 - $816
-
MMBtu
$(-100.0)
05 2.1233: Analyze flue gas for proper air/fuel ratio $104 - - $204
-
MMBtu
$(-100.0)
TOTAL RECOMMENDED $4,086 $1,163 $3,266
41,911
kWh
$1,020
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $1,406 $1,163 $586
7,327
kWh
$1,020
-
MMBtu
$(-200.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs