ITAC Assessment: WI0021
ITAC logo
ITAC Assessment: WI0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product HANDCRAFTED LUXURY CARS
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area
n/a
Annual Production 150
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,454 890,973
kWh
Natural Gas $23,196 3,992
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,819 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,819

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6121: Reduce hot water temperature to the minimum required $128 - - $128
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $270 $500 $270
3,517
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,116 $576 $2,116
27,550
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $4,305 $2,100 - $4,305
-
MMBtu
TOTAL RECOMMENDED $6,819 $3,176 $2,386
31,067
kWh
$4,433
-
MMBtu
TOTAL IMPLEMENTED $6,819 $3,176 $2,386
31,067
kWh
$4,433
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs