ITAC Assessment: WI0020
ITAC logo
ITAC Assessment: WI0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product SAND CAST TRANSMISSION
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,413 1,105,803
kWh
Natural Gas $74,990 15,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,041 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,092

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $7,240 - $7,240
89,683
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,253 - $2,253
27,843
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $33 $563 $33
293
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,819 $1,400 - $1,819
-
MMBtu
05 2.7226: Use computer programs to optimize hvac performance $1,026 $2,500 $1,026
12,603
kWh
-
06 2.8113: Purchase gas directly from a contract gas supplier $23,670 - - $23,670
-
MMBtu
TOTAL RECOMMENDED $36,041 $4,463 $10,552
130,422
kWh
$25,489
-
MMBtu
TOTAL IMPLEMENTED $9,092 $1,963 $7,273
89,976
kWh
$1,819
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs