| Assessment Year | 2003 |
|---|---|
| Principal Product | Automotive Air Conditioner Clutch Assemblies |
| NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 50 |
| Plant Area |
90,000
ft2
|
| Annual Production | 3,000,000
pieces
|
| Production Hrs. Annual | 4,750
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $109,892 | 4,826,080 |
kWh
|
$0.023 |
| Electricity Demand | $174,262 | 9,698 |
kW-mo/yr
|
$17.97 |
| Electricity Fees | $20,200 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $85,690 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $70,076 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,492 | $5,655 |
$1,238
54,350
kWh
|
$2,254
-
kW-mo/yr
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $42,683 | $2,100 |
$20,509
900,743
kWh
|
$22,174
-
kW-mo/yr
|
- | - | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $6,416 | $10,600 |
$2,254
99,000
kWh
|
$7,116
-
kW-mo/yr
|
$(-2,954.0)
-
MMBtu
|
- | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $5,706 | $1,660 |
$1,222
53,690
kWh
|
$3,864
-
kW-mo/yr
|
- | $620 | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $13,693 | $1,000 | - |
$13,693
-
kW-mo/yr
|
- | - | |
| 06 | 2.4225: Install common header on compressors | $13,700 | $6,480 |
$5,290
232,315
kWh
|
$8,410
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $85,690 | $27,495 |
$30,513
1,340,098
kWh
|
$57,511
-
kW-mo/yr
|
$(-2,954.0)
-
MMBtu
|
$620 | ||
| TOTAL IMPLEMENTED | $70,076 | $9,580 |
$25,799
1,133,058
kWh
|
$44,277
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs