ITAC Assessment: OK0782
ITAC logo
ITAC Assessment: OK0782
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Rupture Discs
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 20,000
ft2
Annual Production 150,000
lb
Production Hrs. Annual 4,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,943 1,319,240
kWh
Natural Gas $6,405 484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,100

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $852 $354 $852
9,223
kWh
-
02 2.2437: Recover waste heat from equipment $1,732 $3,742 - $1,732
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,733 - $1,733
12,969
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,005 $7,542 $2,005
21,703
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,300 $11,120 $2,300
24,888
kWh
-
06 2.7425: Clean or color roof to reduce solar load $804 $4,800 $804
8,702
kWh
-
07 2.2136: Install / repair insulation on steam lines $4,815 $820 $4,815
52,103
kWh
-
08 2.7491: Insulate glazing, walls, ceilings, and roofs $700 $1,825 $700
7,567
kWh
-
TOTAL RECOMMENDED $14,941 $30,203 $13,209
137,155
kWh
$1,732
-
MMBtu
TOTAL IMPLEMENTED $8,100 $2,999 $8,100
81,862
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs