Assessment Year | 1999 |
---|---|
Principal Product | Electrical switchgear |
NAICS |
n/a
|
SIC | 3613: Switchgear and Switchboard Apparatus |
Sales Range | $50 M to 100M |
# of Employees | 270 |
Plant Area |
285,000
ft2
|
Annual Production | 11,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $379,787 | 8,062,427 |
kWh
|
$0.047 |
Electricity Demand | $87,712 | 17,937 |
kW-mo/yr
|
$4.89 |
Electricity Fees | $1,372 | - |
|
- |
LPG | $48,345 | 9,474 |
MMBtu
|
$5.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $240,674 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,208 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $1,968 | $1,500 |
$1,968
41,911
kWh
|
- | - | - | - | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,307 | $240 |
$1,131
24,033
kWh
|
$176
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.7224: Reduce space conditioning during non-working hours | $6,654 | $2,000 |
$6,654
141,266
kWh
|
- | - | - | - | - | - | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $98,761 | $465,000 |
$37,021
838,804
kWh
|
$18,240
-
kW-mo/yr
|
- | - | - | $43,500 | - | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $17,776 | $20,000 |
$17,776
377,491
kWh
|
- | - | - | - | - | - | |
06 | 2.4226: Use / purchase optimum sized compressor | $3,015 | $3,000 |
$2,515
53,341
kWh
|
- | - | - | - | $500 | - | |
07 | 3.5316: Contract a wood pallet recycling company | $8,000 | $200 | - | - | - |
$8,000
-
lb
|
- | - | - | |
08 | 4.451: Add additional production shift | $100,000 | $1,000 | - | - | - | - | - | - | $100,000 | |
09 | 4.454: Modify startup/shutdown times | $3,193 | - |
$178
3,810
kWh
|
- |
$765
-
MMBtu
|
- | $2,250 | - | - | |
TOTAL RECOMMENDED | $240,674 | $492,940 |
$67,243
1,480,656
kWh
|
$18,416
-
kW-mo/yr
|
$765
-
MMBtu
|
$8,000
-
lb
|
$2,250 | $44,000 | $100,000 | ||
TOTAL IMPLEMENTED | $14,208 | $3,200 |
$2,693
57,151
kWh
|
- |
$765
-
MMBtu
|
$8,000
-
lb
|
$2,250 | $500 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs