ITAC Assessment: NC0157
ITAC logo
ITAC Assessment: NC0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Electrical switchgear
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $50
M
to 100
M
# of Employees 270
Plant Area 285,000
ft2
Annual Production 11,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $379,787 8,062,427
kWh
Electricity Demand $87,712 17,937
kW-mo/yr
Electricity Fees $1,372 -
LPG $48,345 9,474
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $240,674 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,208

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
01 2.2437: Recover waste heat from equipment $1,968 $1,500 $1,968
41,911
kWh
- - - - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,307 $240 $1,131
24,033
kWh
$176
-
kW-mo/yr
- - - - -
03 2.7224: Reduce space conditioning during non-working hours $6,654 $2,000 $6,654
141,266
kWh
- - - - - -
04 2.7232: Replace existing hvac unit with high efficiency model $98,761 $465,000 $37,021
838,804
kWh
$18,240
-
kW-mo/yr
- - - $43,500 -
05 2.7241: Install outside air damper / economizer on hvac unit $17,776 $20,000 $17,776
377,491
kWh
- - - - - -
06 2.4226: Use / purchase optimum sized compressor $3,015 $3,000 $2,515
53,341
kWh
- - - - $500 -
07 3.5316: Contract a wood pallet recycling company $8,000 $200 - - - $8,000
-
lb
- - -
08 4.451: Add additional production shift $100,000 $1,000 - - - - - - $100,000
09 4.454: Modify startup/shutdown times $3,193 - $178
3,810
kWh
- $765
-
MMBtu
- $2,250 - -
TOTAL RECOMMENDED $240,674 $492,940 $67,243
1,480,656
kWh
$18,416
-
kW-mo/yr
$765
-
MMBtu
$8,000
-
lb
$2,250 $44,000 $100,000
TOTAL IMPLEMENTED $14,208 $3,200 $2,693
57,151
kWh
- $765
-
MMBtu
$8,000
-
lb
$2,250 $500 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs