ITAC Assessment: WI0018
ITAC logo
ITAC Assessment: WI0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product SEATS FOR MASS TRANSIT
NAICS
n/a
SIC 2531: Public Building and Related Furniture
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,900
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,323 776,964
kWh
Other Energy $37,149 6,687
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,584 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,591

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings
01 2.4312: Improve lubrication practices $515 - $515
7,327
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $258 - $258
3,517
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,989 $4,059 $6,989
101,407
kWh
-
04 2.6121: Reduce hot water temperature to the minimum required $818 - $818
11,430
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $4,004 $2,800 - $4,004
-
MMBtu
TOTAL RECOMMENDED $12,584 $6,859 $8,580
123,681
kWh
$4,004
-
MMBtu
TOTAL IMPLEMENTED $1,591 - $1,591
22,274
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs