| Assessment Year | 1988 |
|---|---|
| Principal Product | SEATS FOR MASS TRANSIT |
| NAICS |
n/a
|
| SIC | 2531: Public Building and Related Furniture |
| Sales Range | $10 M to 50M |
| # of Employees | 225 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,900
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $55,323 | 776,964 |
kWh
|
$0.071 |
| Other Energy | $37,149 | 6,687 |
MMBtu
|
$5.56 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,584 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,591 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Energy Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4312: Improve lubrication practices | $515 | - |
$515
7,327
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $258 | - |
$258
3,517
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,989 | $4,059 |
$6,989
101,407
kWh
|
- | |
| 04 | 2.6121: Reduce hot water temperature to the minimum required | $818 | - |
$818
11,430
kWh
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,004 | $2,800 | - |
$4,004
-
MMBtu
|
|
| TOTAL RECOMMENDED | $12,584 | $6,859 |
$8,580
123,681
kWh
|
$4,004
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $1,591 | - |
$1,591
22,274
kWh
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs