ITAC Assessment: WI0013
ITAC logo
ITAC Assessment: WI0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product INDUSTRIAL CONTROLS
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area
n/a
Annual Production 4,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,681 514,068
kWh
Natural Gas $7,751 1,494
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,397 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,277

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $1,120 - $1,120
16,120
kWh
-
02 2.6121: Reduce hot water temperature to the minimum required $302 - $302
4,396
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,253 $4,328 $3,253
46,893
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $840 $1,500 - $840
-
MMBtu
05 2.3191: Use demand controller or load shedder $882 $700 $882
-
kWh
-
TOTAL RECOMMENDED $6,397 $6,528 $5,557
67,409
kWh
$840
-
MMBtu
TOTAL IMPLEMENTED $5,277 $6,528 $4,437
51,289
kWh
$840
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs