ITAC Assessment: TA0017
ITAC logo
ITAC Assessment: TA0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Construction Machinery
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 537,000
ft2
Annual Production 40
units
Production Hrs. Annual 2,148
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,047 736,320
kWh
Electricity Demand $23,785 2,993
kW-mo/yr
Electricity Fees $2,718 -
Natural Gas $7,446 904
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,694 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,564

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $6,600 $192 $6,600
182,995
kWh
- -
02 2.7124: Make a practice of turning off lights when not needed $4,400 - - $4,400
-
kW-mo/yr
-
03 4.821: Pay bills on time to avoid late fees $269 - - - $269
04 2.4231: Reduce the pressure of compressed air to the minimum required $295 $6 $295
8,186
kWh
- -
05 2.4314: Use synthetic lubricant $130 - $43
1,205
kWh
$87
-
kW-mo/yr
-
TOTAL RECOMMENDED $11,694 $198 $6,938
192,386
kWh
$4,487
-
kW-mo/yr
$269
TOTAL IMPLEMENTED $11,564 $198 $6,895
191,181
kWh
$4,400
-
kW-mo/yr
$269
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs